Motorhome work day
Moderators: Mike Simanyi, Christine Grice, Rick Brown
- Eric Clements
- Solo Safety Steward
- Posts: 895
- Joined: Thu May 15, 2008 11:25 am
- Club: No$
- Car#: 30
- Location: Pasadena
Motorhome work day
This Saturday, Oct 3rd, 9am, my house.
Re: Motorhome work day
I know where that is
I'll be there to assist. Should I bring anything?

"Tell me and I forget. Teach me and I remember. Involve me and I learn." - Benjamin Franklin
- John Coffey
- Posts: 635
- Joined: Thu May 15, 2008 11:24 am
- Club: PSCC
- Car#: 250
- Location: La Habra, CA
- Contact:
- Craig Naylor
- Posts: 1973
- Joined: Thu May 15, 2008 11:30 am
- Club: SCNAX
- Car#: 80
- Location: Long Beach
Re: Motorhome work day
Hi Eric, can't make this one, have to work. Let me know when the next one is.
- Eric Clements
- Solo Safety Steward
- Posts: 895
- Joined: Thu May 15, 2008 11:25 am
- Club: No$
- Car#: 30
- Location: Pasadena
Re: Motorhome work day
Since Rick ,George and I (jon helped today) were the only ones that showed up we spent way too much time moving stuff out of the way/cleaning up to get much done... So, next weekend?Craig Naylor wrote: Let me know when the next one is.
I'm actually going to be out of town....
Re: Motorhome work day
I drove by at 9:50 am saw the motor home on the side but didn't see anyone so I left. Left me know if this is on again next weekend or when it's happening again.
"Tell me and I forget. Teach me and I remember. Involve me and I learn." - Benjamin Franklin
- Rick Brown
- Current Solo Director
- Posts: 5129
- Joined: Thu May 15, 2008 11:25 am
- Club: PSCC
- Car#: 240
- Location: Lake Elsinore, CA
Re: Motorhome work day
We were all inside the motor home which is where virtually all the work to be done is. Saw you drive by and wondered where you went.Theo Osifeso wrote:I drove by at 9:50 am saw the motor home on the side but didn't see anyone so I left. Left me know if this is on again next weekend or when it's happening again.
While it may not seem like a lot, the three of us were pretty busy all day. I think George left a little after dark and I left about 10:15pm.
-Mounted all the PA equipment into the wall and added the new high power FM transmitter.
-We stripped out all the extraneous wiring (probably lightened the motor home another 50lbs)
-Rewired the 120v circuits into two separate ones, timing & scoring equipment and everything else.
-Installed the new inverter that auto shuts down at night and put in wiring to the relocated radios and displays so they stay charged without running down the battery at night.
-Other misc stuff.
Eric may have done additional stuff today.
Since light is faster than sound...many people look bright until they speak...
Re: Motorhome work day
Wow! That's a lot of work. I'll have to pull double duty next time.
"Tell me and I forget. Teach me and I remember. Involve me and I learn." - Benjamin Franklin
- Eric Clements
- Solo Safety Steward
- Posts: 895
- Joined: Thu May 15, 2008 11:25 am
- Club: No$
- Car#: 30
- Location: Pasadena
Re: Motorhome work day
Jon & I firred out the walls in the back Sunday afternoon. Today I put in the T&S electrical boxes and pulled wire until I ran out.Rick Brown wrote: Eric may have done additional stuff today.